GEOCLUSTER

Welcome

The GEOCLUSTER project started in the begining of 2008, funded by the research project PTDC/ECM/70368/2006 of the Fundação para a Ciência e a Tecnologia.
The GEOCLUSTER cluster is managed by the Section for Geotechnics, Planning and Transportation of the Department of Civil Engineering of FCT/UNL, beeing its main purpose to support the ongoing research in the field of geomechanics and related areas.

Contacts:

Mário Vicente da Silva (vicente.silva@fct.unl.pt)

Armando Antão (amna@fct.unl.pt)

Overview

Our small cluster currently consists of 16 64-bit nodes, totalling 166 cores, with an aggregate of over 880 GB of memory. A NAS (network-attached storage) system provides 15 TB of shared storage amongst the nodes. All nodes run Ubuntu 26.04 LTS and are interconnected via a private Gigabit Ethernet network, with most nodes using two bonded links.
The users' access to the cluster resources is controlled by the workload manager SLURM. The cluster is eqquiped with C, Fortran and Python compilers, MPI and OpenMP libraries, as well as, mechpy software for finite element limit analysis.


Detailed information:

Head node:
• 1 Quad-Core Intel(R) Xeon(R) CPU E5405 @ 2.00GHz
• 32 GB of ram

5 Nodes:
• 2 Quad-Core Intel(R) Xeon(R) CPU E5405 @ 2.00GHz
• 32 GB of RAM

4 Nodes:
• 2 Quad-Core Intel(R) Xeon(R) CPU E5504 @ 2.00GHz
• 32 GB of RAM

1 Node:
• 2 Quad-Core Intel(R) Xeon(R) CPU E5606 @ 2.13GHz
• 32 GB of RAM

1 Node:
• 12-Core Intel(R) Xeon(R) CPU E5-2650 v4 @ 2.20GHz
• 128 GB of RAM

3 Nodes:
• 12-Core Intel(R) Xeon(R) Silver 4310 CPU @ 2.10GHz
• 128 GB of RAM

1 Node:
• 32-Core Intel(R) Xeon(R) Gold 6414U CPU @ 2.00GHz
• 32 GB of RAM

1 GPU node:
• 6-Core Intel(R) Xeon(R) CPU E5-2420 @ 1.90GHz
• 1 GPU (NVIDIA Tesla M2075)
• 24 GB of RAM